Buying in Mexico, simplified

By David Ross, Real Estate Agent, Coldwell Banker La Costa · 9 min read · Last updated

David Ross is a Real Estate Agent with Coldwell Banker La Costa and part of Team Ross, working with buyers and sellers from the United States and Canada across Puerto Vallarta and Riviera Nayarit. Coldwell Banker La Costa was founded in Puerto Vallarta in 1986 by Brock Squire as the first Coldwell Banker franchise in Mexico, with offices in Marina Vallarta, Zona Romántica and Sayulita.
Hillside building lot with ocean view in Puerto Vallarta, ready for a custom home
A lot is only the first step: title, zoning, permits and the right team decide how smoothly a custom home comes together.

Can foreigners buy land and build in Puerto Vallarta?

Yes. Foreigners can buy titled private land in Puerto Vallarta and Riviera Nayarit and build a home on it. Because the coast is in Mexico's restricted zone, a foreign buyer usually holds the lot through a fideicomiso (bank trust). Before building, you confirm title and zoning, design the home, and obtain a municipal construction license.

Buying a lot and building lets you choose the view, the floor plan and the finishes, which is why many buyers from the United States and Canada consider it. It also adds steps that a finished home does not have: soil and survey work, design, permits, a construction contract and months of supervision. This guide walks through each step so you can decide whether a custom build fits your plans.

Key takeaway: the lot purchase follows the same legal path as any property purchase; the extra work begins after closing, with design, permits and construction.

What should you check before buying a lot?

A lot should pass the same title review as a home, plus a few checks that matter only when you plan to build. Your notario público and attorney handle the legal review; your architect or engineer helps with the physical checks.

Title and land history

Confirm that the lot is titled private property recorded in the Public Registry of Property, with a current lien certificate (certificado de libertad de gravamen) and paid property tax (predial). For land outside established neighborhoods, confirm that it is not ejido land under the agrarian regime, which a foreigner cannot simply buy; our guide to ejido land in Mexico explains why. Compare the deed and cadastral records with a fresh topographic survey so the boundaries on paper match the boundaries on the ground.

Zoning and what you can build

Ask the municipality for the land use (uso de suelo) that applies to the lot before you buy. Puerto Vallarta regulates density, height and setbacks through partial urban development plans (planes parciales de desarrollo urbano) that the city has published by district. Lots in Nuevo Vallarta, Bucerías, Punta de Mita, Sayulita and San Pancho fall under the municipality of Bahía de Banderas in Nayarit, which has its own rules. Gated communities and condominium developments often add architectural guidelines and design review on top of city rules.

Physical conditions

Hillside lots with ocean views are popular on Banderas Bay, and slope changes everything: foundations, retaining walls, access for trucks and drainage in the rainy season. A soil study and a structural review before you commit help you understand what the lot will cost to build on, not only what it costs to buy. Also ask how water, electricity and drainage reach the lot.

Beachfront lots carry one more check. The first 20 meters inland from the high tide line along Mexico's beaches is federal maritime terrestrial zone (zona federal marítimo terrestre), which is federal land that requires a concession to use. Our due diligence checklist covers the full title and permit review.

The cheapest lot is not always the cheapest place to build: slope, soil, access and services can change the construction budget more than the land price.

What permits are needed to build in Puerto Vallarta?

The core permit is the municipal construction license (licencia de construcción), issued by the municipality where the lot sits: Puerto Vallarta for lots in Jalisco, Bahía de Banderas for lots in Riviera Nayarit north of the Ameca River. The municipality reviews the architectural project and supporting documents against the zoning for that lot. Requirements, studies and fees change, so your architect should confirm the current list with the municipality before design is final.

Approval or stepWho issues or handles itWhen it applies
Land use confirmation (uso de suelo)MunicipalityBefore buying and before design
Topographic survey and soil studySurveyor and engineer you hireBefore design
Community design approvalHOA or developerIn gated communities and condominium lots
Construction license (licencia de construcción)MunicipalityBefore work starts
Environmental reviewEnvironmental authoritiesWhere the site or project requires it, for example near the coast or rivers
Federal zone concessionFederal governmentOnly to use the 20 meter federal beach zone
Registration of the construction work with IMSSThe employer of the workers, usually the contractorWithin five business days of starting work

What is the IMSS construction registration?

Mexico's social security institute, IMSS, requires employers in construction to register each construction work, its location and its phases within five business days after work begins, under article 12 of the regulation for construction workers hired by project or for a set time, according to the IMSS procedure page for registering construction works. When you hire a general contractor, the contractor normally acts as the employer. If you hire workers directly, you may take on employer obligations yourself, so agree in writing who is the employer and who registers the work.

Put in the contract who employs the crew, who registers the work with IMSS and who pays the related contributions; leaving it unclear can shift obligations to the owner.

Who do you need on your building team?

  • Notario público and attorney: title review, the fideicomiso and the purchase deed.
  • Architect: design, permit drawings and, often, supervision.
  • Structural engineer and surveyor: soil, slope and structural design.
  • General contractor: the crew, materials and schedule.
  • Project manager or owner's representative: someone on site who reports to you when you are not in Puerto Vallarta.
  • Accountant: invoices (facturas) that document construction costs, which can matter for capital gains tax when you sell.

Keeping every invoice matters later. Documented construction costs can support deductions when you sell, as our guide to capital gains tax when selling property in Mexico explains.

How do you choose a contractor in Mexico?

Ask to visit homes the contractor has finished and to speak with past clients, ideally owners who were living abroad during construction. Compare written bids line by line rather than by total, since one bid may include finishes or permits that another leaves out. A clear contract states the scope, the drawings it follows, the payment schedule tied to completed phases, who buys materials, who employs the workers and how changes are priced.

Construction in Mexico is often described in three phases: obra negra (structure and walls), obra gris (installations and rough finishes) and obra blanca (final finishes). Paying by completed phase, with photos and site visits from your architect or project manager, keeps payments aligned with progress.

How long does it take to build a house in Puerto Vallarta?

Plan for more than the construction itself. Design, studies and permits come first, and their timing depends on the municipality, the complexity of the project and how quickly documents are ready. For construction alone, architects interviewed by Out and About PV in 2021 said a simple single-level home of about 100 square meters on flat land can take about three months, while a home of four or more levels on a sloped lot can take up to a year.

StageWhat happensWhat drives the timing
Purchase and closingTitle review, fideicomiso, deedDocuments, bank trust setup, notary schedule
Studies and designSurvey, soil study, architectural and structural designSize of the home, revisions, slope
PermitsConstruction license and any required approvalsMunicipality, community review, completeness of the file
ConstructionObra negra, obra gris, obra blancaSize, slope, access, rainy season, materials
HandoverFinal walkthrough, utilities, final documentsPunch list, utility connections

The rainy season, which brings heavy summer storms to Banderas Bay, can slow earthwork on hillside lots, so many owners plan the most exposed phases for the drier months.

Should you build or buy a finished home?

Building gives you control over design and orientation, and it suits owners who can be patient and stay involved. Buying a finished home or a unit in a new development gives you a known product and a faster move-in. Our guide to pre-construction vs resale in Puerto Vallarta compares the other two paths, and our new construction page lists current developments.

A custom home rewards owners who plan for time, supervision and paperwork as carefully as they plan the floor plan.

Our take

Building on Banderas Bay can be one of the most rewarding ways to own here, as long as the lot is right before the design starts. We suggest a simple order: confirm title and zoning, study the site, design to the rules, secure the license and then build with a clear contract and someone on site who reports to you. Coldwell Banker La Costa has worked in Puerto Vallarta since 1986 and can help you find lots and connect with notaries, architects and other local professionals.

The short version: buy titled land with the right zoning, budget for the slope, get the construction license before work starts and put the contractor's responsibilities in writing.

Frequently asked questions

Can foreigners buy land and build in Puerto Vallarta?

Yes. Foreigners can buy titled private land and build a home in Puerto Vallarta and Riviera Nayarit. On the coast, which is in Mexico's restricted zone, a foreign buyer usually holds the land through a fideicomiso, a bank trust. Ejido land under the agrarian regime is not a simple purchase for a foreigner, so confirm the title first.

What permits are needed to build a house in Puerto Vallarta?

The main permit is the municipal construction license, issued by Puerto Vallarta in Jalisco or by Bahía de Banderas in Riviera Nayarit. The project must fit the land use for the lot, gated communities may require design approval, and some sites need environmental review. Confirm the current requirements with the municipality through your architect.

How long does it take to build a house in Puerto Vallarta?

Construction alone can take about three months for a simple single-level home on flat land and up to a year for a multilevel hillside home, according to architects interviewed by Out and About PV in 2021. Add time before construction for studies, design and permits.

Do I need to register construction workers with IMSS?

The employer of the workers must register the construction work with IMSS within five business days of starting. When you hire a general contractor, the contractor normally acts as employer. If you hire workers directly, you may become the employer, so put these responsibilities in writing and confirm with an accountant.

Should I build a home or buy a finished one?

Building gives you control over design and view but takes more time, supervision and paperwork. Buying a finished home or a new development unit is faster and more predictable. The right choice depends on your timeline, how involved you want to be and the lots available.

Thinking about a lot on Banderas Bay? David Ross and Team Ross at Coldwell Banker La Costa can help you find land, review it with the right professionals and compare it with finished homes.

Talk with David RossHow to buy in MexicoExplore new construction

This article is general information for buyers in Puerto Vallarta and Riviera Nayarit. It is not legal, tax or construction advice. Permit requirements, fees and procedures change and differ between municipalities; confirm your situation with a Mexican notario público, a qualified attorney or tax advisor, and a licensed architect or engineer. Sources: Instituto Mexicano del Seguro Social, procedure IMSS-02-097, registration of construction works, phases and incidents (accessed November 24, 2026); Out and About PV, Want to Build a New Home in México (November 10, 2021); MexHome, verifying a property title in Mexico (July 2026); Gobierno de Jalisco, SIGA, Puerto Vallarta partial urban development plans by district (2021). Coldwell Banker La Costa supports the principles of the Fair Housing Act and equal opportunity. Each office is independently owned and operated.